The Buffalo Niagara International Airport is reaching out to contractors nationwide to gauge interest in a $50,000,000 rehabilitation and reconstruction project.
This is a meeting only to discuss an upcoming project to be advertised for bid in early December 2023. Bidding documents will be available at the time of bid advertisement.
Agenda for discussion:
1) Scope of Work
o Rehabilitation and reconstruction of 4,135 linear feet of Runway
o Reconstruction of three connector taxiways
o Installation of approximately 68,000 tons of runway asphalt pavement
o Installation of approximately 175,000 LF airfield electrical cable / 70,000 LF conduit duct bank
o Installation of approximately 350 L-868B Load Bearing Light Bases
o Installation of approximately 50 Size 3 airfield guidance signs (1 to 4 module)
2) Schedule
3) Bonding and insurance requirements
4) Joint venture contractual clauses
This is an informational meeting to discuss the project scope, available contract types, schedule, operational limitations, and material availability.
Thursday Nov 16, 2023
2:00 PM - 4:00 PM EST
November 16th at 2:00 PM
Sean Slage
Send Email
Printed courtesy of www.bxkentucky.com/ – Contact the Builders Exchange of Kentucky for more information.
P.O. Box 5398, Louisville, KY 40255 – 502-459-9800 – info@bxkentucky.com